Installing the boiler
Electrical connections
Routing the connecting cables
!
Please note
Connecting cables will be dam-
aged if they touch hot compo-
nents.
A LV connections
B 230 V connections
C Internal extension
D Main PCB
28
(cont.)
E Communication module (accesso-
ries)
F Cable grommet for power cable
When routing and securing
cables/leads on site, ensure that
the maximum permissible tem-
peratures for these cables/leads
are not exceeded.