Further details regarding the individual steps
Weather-compensated control unit
Service menu
1. Press OK and å simultaneously for
approx. 4 s.
2. "Service functions"
3. "Max. output"
4. "Change?" Select "Yes".
A value is shown on the display (e.g.
"85"). In the delivered condition, this
value represents 100 % of rated heat-
ing output.
5. Set the required value.

Tightness test, balanced flue system (annular gap check)

A
A Combustion air aperture (ventilation
air)
For balanced flue systems tested
together with the wall mounted gas fired
boiler, the requirement for a tightness
test during commissioning by the flue
gas inspector is not applicable.
Commissioning, inspection, maintenance
(cont.)
Constant temperature control unit
Service menu
1. Press OK and å simultaneously for
approx. 4 s.
2. Select "3" with Ú and confirm with
OK.
A value flashes on the display (e.g.
"85") and "A" appears. In the deliv-
ered condition, this value represents
100 % of rated heating output.
3. Select required value and confirm with
OK.
We recommend that your heating engi-
neer carries out a simple leak/tightness
test during the commissioning of your
system. For this, it would be sufficient to
check the CO
or O
2
combustion air at the annular gap of the
balanced flue pipe.
The flue pipe is deemed to be gas-tight
if the CO
concentration in the combus-
2
tion air is no higher than 0.2 % or the
O
concentration is at least 20.6 %.
2
If actual CO
values are higher or O
2
ues are lower, then pressure test the flue
pipe with a static pressure of 200 Pa.