Initial Startup

2.5
Startup and operational checks should be performed only by authorized service
personnel. Contact service in advance (usually a two week notice is required) to
reserve a preferred startup date.

Completing the Installation Checklist

2.6
The final step in installing your UPS system is completing the following Installation
Checklist. This checklist ensures that you have completely installed all hardware,
cables, and other equipment. Completing all items listed on the checklist will
ensure a smooth installation. You should make a copy of the Installation Checklist
before filling it out, and retain the original.
After your installation is complete, a service representative will be able to verify the
operation of your UPS system and commission it to support your critical load. The
service representative cannot perform any installation tasks other than verifying
software and operating setup parameters. Service personnel may request a copy
of the completed Installation Checklist to be sure you have completed all
applicable equipment installation.
NOTE: The Installation Checklist MUST be completed prior to starting the UPS
system for the first time.
Powerware 9330 (IBM 9910 20 kVA) Installation and Operation
164201491 REV. B 013004
2--21