13.
Remove the top side panel mounting screw (tie/grounding bracket location in
Figures 2---7) from both the Option and UPS cabinets.
14.
Secure the back of Options cabinet to the back of the UPS cabinet with the
tie/grounding bracket. Secure the bracket with the side panel mounting
screws.
15.
Proceed to paragraph 2.4.3.
16.
Using retained hardware, reinstall shipping brackets previously removed to
front and rear of Options cabinet with the angle facing outward (see Figure
2---8).
17.
Secure the front of Options cabinet to the front of the UPS cabinet with the
long flat grounding/mounting bracket from the installation kit (see Figure 2---8).
Use hardware provided in the kit to secure the bracket.
18.
Remove the top side panel mounting screw (tie/grounding bracket location in
Figure 2---8) from both the Option and UPS cabinets.
19.
Secure the back of Options cabinet to the back of the UPS cabinet with the
tie/grounding bracket. Secure the bracket with the side panel mounting
screws.
20.
Secure cabinets to floor with contractor supplied hardware.
21.
Proceed to paragraph 2.4.3.