Dimension Sheet 4, Valve Train - Rotax 912-UL Repair Manual

Hide thumbs Also See for 912-UL:
Table of Contents

Advertisement

L1.4) Dimension sheet 4:
Valve train
engine no.
Valve train
1) Checking of actuating position on hydraulic tappets
The nominalworking
point is positioned in the mid-range of the possible travel.
Checking by measuring valve clearance with tappets empty (assembly state) and
pushrods pressed down.
The respective cylinder must be in ignition T.D.C. range.
no. of cylinder
1
2
3
4
nominal
Tappet
clearance
inlet
2 + 5 m m
. 0 7 9 + . 1 9 7 i n
ex-
.
ilausl
remarK
2) Valve timing at 1 mm valve lift
Set valve train free of play by distance piece and take readings with cylinder 1 in ignition
T.D.C. and at 1 mm valve lift.
Priorto checking of valve timing furnish engine with dialgauge support and angle finder.
Tester:
date:
exhausl openr
B.B.D.C.
inlet opens
T.D.C
9X
haust c loses
T.D.C.
inlet closss
A.B.D.C.
nominal
44o + 48o 2ob. + 2oa. 2ob. + 2oa.
44o + 48o
actual
remarks
ft6'pt!:Uf:
77,,,,,,"1992

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents