Sign In
Upload
Manuals
Brands
Zte Manuals
Server
NetNumen U31 R06
Zte NetNumen U31 R06 Manuals
Manuals and User Guides for Zte NetNumen U31 R06. We have
1
Zte NetNumen U31 R06 manual available for free PDF download: Hardware Installation Manual
Zte NetNumen U31 R06 Hardware Installation Manual (128 pages)
Unified Element Management System
Brand:
Zte
| Category:
Server
| Size: 13.36 MB
Table of Contents
Table of Contents
3
Chapter 1 Installation Flow
5
Figure 1-1 Hardware Installation Flow
6
Chapter 2 Installation Preparations
7
Environment Check
7
Table 2-1 Tools and Meters
8
Tools Preparation
8
Required Documents
11
Chapter 3 Unpacking and Checking Equipment
13
Figure 3-1 Unpacking a Wooden Case
14
Figure 3-2 Removing the Outer Packing of a Carton
14
Figure 3-3 Removing the Board Package
15
Chapter 4 Removing Cabinet Doors
17
Figure 4-1 Opening the Door Lock
17
Figure 4-2 Disconnecting the Grounding Cable
18
Figure 4-3 Disassembling the Cabinet Door
19
Chapter 5 Cabinet Installation
21
Figure 5-1 Installing the Cabinet on the Adjustable Base
21
Table 5-1 Solutions for Installing the Cabinet
21
Installing the Cabinet on the Adjustable Base
22
Figure 5-2 Installing the Cabinet on the Floor
22
Figure 5-3 Installation Position of the Cabinet
24
Table 5-2 Adjustable Heights
24
Figure 5-4 Adjustable Base of Type a
25
Figure 5-5 Marking Holes for Installing a Single Cabinet (Unit: MM)
25
Figure 5-6 Marking Holes for Installing Multiple Cabinets (Unit: MM)
26
Figure 5-7 Marking Installation Holes Using the Drilling Template
26
Figure 5-8 Drilling Indentations
27
Figure 5-9 Drilling a Hole
27
Figure 5-10 AN01 Socket Bolt
28
Figure 5-11 Hammering a Socket Bolt
28
Figure 5-12 Adjusting the Height of an Adjustable Base
29
Figure 5-13 Securing an Adjustable Base
30
Figure 5-14 Removing Bolts from an Adjustable Base
31
Figure 5-15 Adjusting the Level of the Adjustable Base
31
Figure 5-16 Adjusting the Level of Multiple Adjustable Bases
32
Figure 5-17 Measuring Resistance for the Adjustable Base
33
Figure 5-18 Installing a Cabinet
34
Figure 5-19 Adjusting the Level of the Cabinet
35
Figure 5-20 Space between Side-By-Side Cabinets
36
Figure 5-21 Connecting Neighboring Cabinets
36
Figure 5-22 Installing the Shockproof Assembly (1)
37
Installing the Cabinet on the Floor
38
Figure 5-23 Installing the Shockproof Assembly (2)
38
Figure 5-24 Cabinet Installation Position
39
Figure 5-25 Marking Holes for Installing a Single Cabinet (Unit: MM)
40
Figure 5-26 Marking Holes for Installing Multiple Cabinets (Unit: MM)
40
Figure 5-27 Marking Installation Holes Using the Drilling Template
41
Figure 5-28 Drilling Indentations
41
Figure 5-29 Drilling a Hole
42
Figure 5-30 Socket Bolt AN01
42
Figure 5-31 Hammering a Socket Bolt
43
Figure 5-32 Installing a Cabinet
44
Figure 5-33 Adjusting the Level of the Cabinet
45
Figure 5-34 Measuring Resistance of the Cabinet
46
Figure 5-35 Space between Side-By-Side Cabinets
47
Figure 5-36 Connecting Neighboring Cabinets
48
Figure 5-37 Installing the Shockproof Assembly (1)
49
Figure 5-38 Installing the Shockproof Assembly (2)
50
Figure 6-1 Power Supply System of a Cabinet
52
Figure 6-2 Unified PDU
52
Table 6-1 Relationship between Input Terminals and Output Terminals
52
Chapter 6 Installation of External Power Cables and Grounding Cables
53
Cabling Requirements
53
Figure 6-3 Routing of Power Cables and Grounding Cables
53
Figure 6-4 Installation Modes of O-Type Terminals
54
Figure 6-5 Distance between Power Cables and Signal Cables
55
Figure 6-6 Cable Binding
55
Figure 6-7 Top Routing of a Cabinet
56
Installing Power Cables and Grounding Cables
57
Figure 6-8 Bottom Routing of a Cabinet
57
Figure 7-1 Installing an E4140 Shelf
60
Figure 7-2 Jumpers of the NCDM Board
60
Chapter 7 Assembly Installation in a Cabinet
61
Installing Boards
61
Table 7-1 Function Description of Jumpers
61
Removing a Blank Panel
62
Figure 7-3 Relationships between Active and Standby Slots
62
Figure 7-4 Wearing an ESD Wrist Strap
62
Figure 7-5 Removing a Rear Blank Panel
63
Installing a Board
64
Figure 7-6 Removing a Front Blank Panel
64
Figure 7-7 Checking the Memory Installation
65
Figure 7-8 Opening the Extractors for the Memory Slots
66
Figure 7-9 Reinstalling the Memory Bar
67
Figure 7-10 Opening Extractors of a Board
68
Figure 7-11 Installing a Board
69
Chapter 8 Installation of Internal Power Cables and Grounding Cables
71
Power Supply System in a Cabinet
71
Figure 8-1 Cabling in a Cabinet
72
Table 8-1 Relationships between Internal Assemblies and Control Switches of the Unified PDU
72
Installing Cables for an E4140 Shelf
73
Figure 8-2 Installing Grounding Cables for the E4140 Shelf
74
Figure 8-3 Installing Power Cables for the E4140 Shelf
75
Figure 9-1 Cable Binding
78
Chapter 9 Signal Cable Installation
79
Figure 9-2 Cable Outlets on the Cabinet Top
79
Setting Jumpers and DIP Switches of the Unified PDU
80
Figure 9-3 Cable Outlets on Cabinet Bottom
80
Figure 9-4 DIP Switch and RS485 Jumper
81
Figure 9-5 RS485 Jumper
81
Table 9-1 DIP Switch Location
81
Figure 9-6 Removing the PDUM Board
82
Figure 9-7 Settings of RS485 Jumper and Cabinet ID DIP Switch
83
Installing the Network Cables
84
Figure 9-8 Installing the PDUM Board
84
Figure 9-9 Cabling Connections in the Cabinet
85
Figure 9-10 Cabling Connections between Cabinets
86
Chapter 10 Cabinet Accessory Installation
87
Installing the Cabinet Side Door
87
Figure 10-1 Installing the Grounding Cable of the Side Door
88
Installing the Front and Rear Doors
89
Figure 10-2 Installing the Side Door of the Cabinet
89
Figure 10-3 Installing the Grounding Cable of the Door
90
Figure 10-4 Measuring the Resistance of the Grounding Cable
91
Chapter 11 Peripheral Device Installation
93
Installing Terminal Devices
93
Alarm Box Installation
94
Installing the Alarm Box
94
Figure 11-1 Installing a Mounting Plate
95
Figure 11-2 Installing an Alarm Box
95
Connecting Cables (AC Power Supply)
96
Figure 11-3 AC Adaptor and Power Cable
97
Connecting Cables (DC Power)
98
Table 11-1 DC Power Cable Parameters
98
Chapter 12 Installation Inspection
101
Checking the Cabinets
101
Checking the Assemblies in the Cabinets
102
Checking the Power Cables and Grounding Cables
102
Checking the Signal Cables
103
Checking the Other Auxiliary Devices
103
Figure 13-1 Measuring Resistances between Poles
106
Figure 13-2 Front Panel of the Unified PDU
106
Chapter 13 System Power-On
107
Powering on the E4140 Shelves
107
Chapter 14 Site Clean-Up
109
Appendix A Making a Power Cable and a Grounding Cable
111
Figure A-1 Cutting out a Cable
111
Figure A-2 Putting a Heat-Shrink Tube Onto the Cable
112
Figure A-3 Stripping off the Insulation Layer
112
Figure A-4 Plugging the Cores into the Tube
113
Figure A-5 Crimping the Tube
113
Figure A-6 Blowing the Heat-Shrink Tube
114
Appendix B Making a Network Cable
115
Figure B-1 Components of an Unshielded Cable
115
Figure B-2 Pin Numbers
116
Table B-1 Connection Relationships of a Straight-Through Cable
116
Table B-2 Connection Relationships of a Crossover Cable
116
Figure B-3 Stripping off the Cable Jacket
117
Figure B-4 Arranging the Core Wires
117
Figure B-5 Connecting the Twisted-Pair Cable
118
Figure B-6 Crimping the Connector
118
Figure B-7 Testing the Network Cable
119
Figures
121
Tables
125
Glossary
127
Advertisement
Advertisement
Related Products
zte Unite Mobile Hotspot
zte Unite
zte Unite II
Zte -U V856
ZTE USB Modem
Zte U V760
Zte U N720
Zte U5100
Zte ZTE-U X850
Zte U.S. CELLULAR 4G LTE Router with Voice
Zte Categories
Cell Phone
Modem
Wireless Router
Network Router
Switch
More Zte Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL