Chapter 1
Installation Flow
Before starting hardware installation, you shall complete corresponding preparations, such
as preparing construction conditions, checking installation environment, and unpacking
and inspecting goods, so that the later installation process can be smooth and efficient.
For the hardware installation flow, see
Figure
1-1.
1-1
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential