Figure 9-6 Removing The Pdum Board - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

NetNumen™ U31 R06 Hardware Installation Guide
Cabinet ID
12
13
14
15
16
l
The DIP switch for power type selection is used to set the power system for the unified
PDU. By default, it is set to -48 V
When the DIP switch is set to 1010, the unified
à
When the DIP switch is set to other values, the unified
à
V DC.
Steps
1. Wear an
of the strap into the
2. Use the cross head screwdriver to loosen the captive screws on the panel of the
board. Hold the handle on the panel and horizontally pull out the
Figure
The
PDUM
power off the

Figure 9-6 Removing the PDUM Board

1. PDUM board
SJ-20141121113158-006|2014-12-20 (R1.0)
Binary
1011
1100
1101
1110
1111
ESD
wrist strap (or anti-static gloves), and then install the grounding terminal
ESD
jack on the cabinet.
9-6.
Note:
board of the unified
PDUM
board before removing the board.
1
2
OFF
OFF
ON
ON
OFF
ON
ON
OFF
OFF
OFF
DC
power system.
PDU
supports hot swapping. Users do not need to
2. Captive screw
9-6
3
4
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
PDU
power system is -60 V DC.
PDU
power system is -48
PDUM
ZTE Proprietary and Confidential