Figure 5-17 Measuring Resistance For The Adjustable Base - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

Figure 5-17 Measuring Resistance for the Adjustable Base

Installing the cabinet
16. Lift the cabinet onto the adjustable base.
17. Align the installation holes at the bottom of the cabinet with the installation holes on
the surface of the cabinet.
18. Secure the cabinet with bolts, see
SJ-20141121113158-006|2014-12-20 (R1.0)
Figure
5-18.
5-13
ZTE Proprietary and Confidential
Chapter 5 Cabinet Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents