Top Routing Principles
Power cables and grounding cables are routed from the top of the
DC
power distribution
box to the cable ladder, and then to the cabinet top along the cable ladder, see
Figure
6-7.

Figure 6-7 Top Routing of a Cabinet

1. Cable ladder
2. Cover plate for power
3. Unified
PDU
cables
Bottom Routing Principles
Power cables and grounding cables are routed from the bottom of the
DC
power distribution
box to the cabinet bottom through the static conductive floor, see
Figure
6-8.