Figure A-4 Plugging The Cores Into The Tube; Figure A-5 Crimping The Tube - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

Figure A-4 Plugging the Cores into the Tube

1. Tube
5. Crimp the tube tightly by using a hydraulic cable lug crimper, see
tube is crimped, drag the terminal with full force. The terminal should be tightened.
Note:
The dies used in the hydraulic cable lug crimper must have the same diameter as the
cable.

Figure A-5 Crimping the Tube

1. Die
6. Move the heat-shrink tube to the tube and cover it completely.
7. Blow the heat-shrink tube by using the heat gun until the heat-shrink tube wraps the
tube of the tubular lug tightly, see
SJ-20141121113158-006|2014-12-20 (R1.0)
Appendix A Making a Power Cable and a Grounding Cable
2. Heat-shrink tube
Figure
A-6.
A-3
Figure
A-5. After the
ZTE Proprietary and Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents