NetNumen™ U31 R06 Hardware Installation Guide
Figure 5-23 Installing the Shockproof Assembly (2)
1. Horizontal
2. Vertical support
3. Cable ladder
4. M12×25/M8×25
25. Restore the static conductive floor. Adjust the support kit for the static conductive floor
again. Install the static conductive floor.
If bottom routing is used, ensure that cabling is complete.
– End of Steps –
5.2 Installing the Cabinet on the Floor
This procedure describes how to install the cabinet on the concrete floor.
SJ-20141121113158-006|2014-12-20 (R1.0)
support
hexagon socket
cap head
Note:
bolt (Spring
washer, gasket,
and insulating
washer)
5. Insulating gasket
6. Lock rod (M8
hexagon nut,
5-18
ZTE Proprietary and Confidential
spring washer,
and gasket)
7. Bolt (M8 nut,
spring washer,
and gasket)