Figure 5-29 Drilling A Hole; Figure 5-30 Socket Bolt An01 - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

NetNumen™ U31 R06 Hardware Installation Guide

Figure 5-29 Drilling a Hole

1. Vacuum cleaner
5. Remove the bolt, spring washer, insulating washer, and gasket of the AN01 socket
bolt.
For the overview of AN01 socket bolt, see

Figure 5-30 Socket Bolt AN01

1. M12×90 bolt
2. Spring washer
6. Install the socket bolt vertically into the hole. Hammer the socket bolt by using the
claw hammer until the expansion tube enters the hole completely, see
SJ-20141121113158-006|2014-12-20 (R1.0)
2. Percussion drill
Figure
5-30.
3. Gasket
4. Insulating washer
5-22
ZTE Proprietary and Confidential
5. Expansion tube
Figure
5-31.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents