4. Adhesive tape
4. Remove the board package.
a. Wear antistatic gloves (or an
b. Remove the board package, see
Figure 3-3 Removing the Board Package
1.
c. For the board that is not installed immediately, put it back in its original package,
and then seal the package.
5. Check to ensure that the equipment is in good condition and the quantity is correct
before equipment hand-over and storage.
– End of Steps –
SJ-20141121113158-006|2014-12-20 (R1.0)
ESD
wrist strap
Chapter 3 Unpacking and Checking Equipment
5. Foam board
ESD
wrist strap).
Figure
3-3.
3-3
ZTE Proprietary and Confidential
6. Board box