Figure 3-3 Removing The Board Package - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

4. Adhesive tape
4. Remove the board package.
a. Wear antistatic gloves (or an
b. Remove the board package, see

Figure 3-3 Removing the Board Package

1.
c. For the board that is not installed immediately, put it back in its original package,
and then seal the package.
5. Check to ensure that the equipment is in good condition and the quantity is correct
before equipment hand-over and storage.
– End of Steps –
SJ-20141121113158-006|2014-12-20 (R1.0)
ESD
wrist strap
Chapter 3 Unpacking and Checking Equipment
5. Foam board
ESD
wrist strap).
Figure
3-3.
3-3
ZTE Proprietary and Confidential
6. Board box

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents