NetNumen™ U31 R06 Hardware Installation Guide
Figure 7-10 Opening Extractors of a Board
1. Extractor
4. In accordance with the hardware configuration plan, determine the cabinet, the shelf,
and the slot where the board is installed.
5. Install the board into the shelf and secure it in the shelf, see
a. Hold the lower edge of the board with one hand, and seize one extractor of the
board with the other hand. Push the board slowly along the slot rails into the shelf.
b. Close the upper and lower extractors at the same time until the latches lock the
extractors completely.
c. Tighten the captive screws.
SJ-20141121113158-006|2014-12-20 (R1.0)
2. Latch
7-10
ZTE Proprietary and Confidential
Figure
7-11.