2.3 Required Documents

The following documents must be prepared before installation:
l
Engineering design documents and packing lists
l
Manuals shipped with the products
l
Unpacking Inspection Guide of Core Network Products
l
Environment Acceptance Report of Core Network Products
l
Core Network Product Hardware Installation Quality Standard
SJ-20141121113158-006|2014-12-20 (R1.0)
Chapter 2 Installation Preparations
Name
Purpose
Hydraulic pliers
Crimps O-type terminals and JG ter-
minals.
Work gloves
Used during installation.
Anti-static gloves
Used during installation.
Hacksaw
Cuts wood floor or metal.
Cable tie
Ties up power cables, protective
grounding wires, and signal cables.
Ladder
Used for working at heights.
Punch
Used to locate a drill bit for making
an indentation at the hole location.
2-5