Figure 10-4 Measuring The Resistance Of The Grounding Cable - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

Chapter 10 Cabinet Accessory Installation

Figure 10-4 Measuring the Resistance of the Grounding Cable

4. Verify that the front and rear doors can be opened and closed properly.
For how to open the door of the cabinet, refer to
Chapter 4 Removing Cabinet
Doors.
– End of Steps –
10-5
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents