Figure 9-7 Settings Of Rs485 Jumper And Cabinet Id Dip Switch - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

3. Poke the DIP switch using an object with a sharp end (for example, a pen point) to set
the power type and the cabinet ID in which the unified
cap to connect the RS485 jumper.
For the settings of the RS485 jumper and the cabinet ID DIP switch, see

Figure 9-7 Settings of RS485 Jumper and Cabinet ID DIP Switch

4. Install the
screwdriver to tighten the captive screws clockwise, see
SJ-20141121113158-006|2014-12-20 (R1.0)
PDUM
board into the unified
Chapter 9 Signal Cable Installation
PDU
and push it in place. Use the cross head
9-7
ZTE Proprietary and Confidential
PDU
is installed. Use a jumper
Figure
Figure
9-8.
9-7.