Chapter 5 Cabinet Installation; Figure 5-1 Installing The Cabinet On The Adjustable Base; Table 5-1 Solutions For Installing The Cabinet - Zte NetNumen U31 R06 Hardware Installation Manual

Unified element management system
Table of Contents

Advertisement

Chapter 5
Cabinet Installation
For selecting the cabinet installation mode in accordance with the equipment-room
conditions, refer to

Table 5-1 Solutions for Installing the Cabinet

Equipment Room Condition
The equipment room has static
conductive floor.
The equipment room has no static
conductive floor.

Figure 5-1 Installing the Cabinet on the Adjustable Base

SJ-20141121113158-006|2014-12-20 (R1.0)
Table
5-1.
Installation Solution
Install the cabinet on the adjustable base. Use the adjustable
base to install the cabinet on the concrete floor of the
equipment room, see
Install the cabinet on the floor. Install the cabinet directly on
the concrete floor of the equipment room, see
5-1
Figure
5-1.
Figure
ZTE Proprietary and Confidential
5-2.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents