Figure 5-14 Removing Bolts from an Adjustable Base

1. M12×35 Bolt
2. Spring washer
12. Measure the level of the adjustable bases by using a spirit level.
The deviation should be less than 3 mm. If the adjustable base is not level, place a
spacer shim between the base and the concrete floor, see

Figure 5-15 Adjusting the Level of the Adjustable Base

1. Spirit level
13. Perform the following procedures as required:
SJ-20141121113158-006|2014-12-20 (R1.0)
3. Gasket
4. Adjustable base
2. Spacer shim
5-11
ZTE Proprietary and Confidential
Chapter 5 Cabinet Installation
Figure
5-15.