HYOSUNG Prima Service Manual page 119

Hide thumbs Also See for Prima:
Table of Contents

Advertisement

6-21 CHASSIS
● Install the handlebar and tighten the set bolt ① and
clamp bolt ② to the specified torque.
Handlebar set bolt : 22 ~ 28 Nㆍm(2.2 ~ 2.8 kgㆍm)
Handlebar clamp bolt : 48 ~ 52 Nㆍm(4.8 ~ 5.2 kgㆍm)
● After install the front fork and steering stem, inspect
the following items.
∙ Lift the front fork.
∙ Inspect play of the front fork as that grasp lower of
the front fork and shake it by the front and rear.
∙ By the handle turning the right or left, inspect
whether turning smoothly.
∙ Adjust the outer upper race, if the steering is comed
heavy and tight.
● Bleed air of the front brake.(Refer to page 2 - 9)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents