Boiler installation
8.7
Electrical connections
This section only applies to boilers using Buderus
controls.
DANGER TO LIFE
from electric shock.
Only qualified electricians are permitted
WARNING!
to carry out electrical work.
Before you open the control: shut off
electrical supply and secure against
accidental activation.
Please observe all installation
instructions.
8.7.1 Fitting the Logamatic control panel
Locate the push-in hooks of the Logamatic control
panel in the slots.
Push the control panel towards the burner door.
Let the flexible hooks of the control panel click into
the openings by pushing the control panel down.
Remove the Logamatic control panel cover. First
remove the cover screws.
Secure the control panel with self-tapping screws.
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
1
Fig. 53 Fitting the control panel
1 Flexible hooks
2 Locking tabs
3 Slots
4 Openings
Fig. 54 Removing the cover
1 Cover screws
2 Self-tapping screws
2
3
4
1
2
8
39