Positioning And Leveling The Boiler - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

7
Boiler block assembly
Fitting the cable entry
Screw the cable entry to the hole in the boiler back
panel.
7.5

Positioning and leveling the boiler

Position the boiler in its final location.
Level the boiler horizontally by turning the adjustable
feet and using a spirit level.
32
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
Fig. 43 Fitting the cable entry
Fig. 44 Leveling the boiler horizontally
We reserve the right to make any changes due to technical modifications.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents