Preparing Push Nipples And Nipple Ports; Preparing The Intermediate Section - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

Boiler block assembly

7.1.2 Preparing push nipples and nipple ports

Clean the nipples with a cloth soaked in cleaning
agent.
Evenly coat the nipples with red lead putty.
Place nipple straight in the top and bottom boiler hub
of the back section and hammer in a crosswise
pattern.
NOTICE
After driving in the nipple leave it projecting
approx. 1 1/8" from the boiler hub.
Remove any burrs with a file.

7.1.3 Preparing the intermediate section

Prepare the central section in the same way as the back
section (
Chapter 7.1.1, page 16).
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
2
Fig. 7
Driving nipples home
1 Nipple in the upper boiler hub
2 Nipple in bottom boiler hub
1
Fig. 8
Preparing the central section
1 Boiler hub sealing face
2 Packing grooves
7
1
1
2
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents