Inspection And Maintenance Protocols - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

11
Boiler maintenance

11.6 Inspection and maintenance protocols

Sign all service work as completed and enter the
relevant date.
Service work
1.
Check the general condition of the heating system
2.
Visual and function check of the heating system
3.
Check all fuel and water components of the system for:
– leaks during operation
– leak test
– visible signs of corrosion
– signs of ageing
4.
Check the combustion chamber and the heating surface for
contamination; shut down the system for this step
5.
Check the burner (
burner manual)
6.
Check the combustion air supply and flue gas routing for function
and safety
7.
Check the operating pressure, relief valve and expansion tank inlet
pressure
8.
Check the DHW tank and corrosion anode for function (
tank documentation)
9.
Check the control settings (
10. Record the final checks of the inspection work, incl. measurements
and test results
Confirm service work
52
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
control manual)
The service and maintenance protocols can also be
used as templates.
Page Date: ______
48
51
DHW
Company
stamp/signature
We reserve the right to make any changes due to technical modifications.
Date: ______
Date: ______
Company
Company
stamp/signature
stamp/signature

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents