Installation When Boiler Is Supplied Assembled; Installation Steps For Disassembled And Assembled Delivery; Fitting Adjustable Feet - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

7
Boiler block assembly
7.3

Installation when boiler is supplied assembled

A leak test of the boiler block is carried out at the factory
when the boiler is supplied assembled.
Cut through the straps.
Remove the pallet prior to positioning the boiler
block.
DANGER TO LIFE
from falling material.
Ensure that a suitable means of
WARNING!
supporting the load is available.
Observe all locally applicable
Occupational Health & Safety
regulations regarding lifting equipment.
7.4

Installation steps for disassembled and assembled delivery

Carry out the steps detailed in this chapter for deliveries
in sections or as block. Where there are different
procedures for installation between disassembled and
assembled delivery, this is noted in the manual.

7.4.1 Fitting adjustable feet

Use the adjustable feet (packaging
page 12) to adjust the boiler to a horizontal position to
prevent air from collecting in the boiler.
Tip the boiler or support it on a wood block.
Screw in adjustable feet 0.20 - 0.40 inches.
Gently set the boiler down.
26
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
Fig. 27 Boiler block on pallet (as delivered)
1 Securing straps
components
Fig. 28 Fitting adjustable feet
1
We reserve the right to make any changes due to technical modifications.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents