Assembly When Delivered In Sections; Preparing Boiler Sections - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

7
Boiler block assembly
7.1

Assembly when delivered in sections

Assemble all boiler sections in accordance with the
following instructions and diagrams.

7.1.1 Preparing boiler sections

Position the rear section onto two wood blocks.
Clean the boiler hubs with sandpaper and a rag.
Remove any burrs with a file.
Clean the packing spring or packing groove with a
wire brush and rag.
RISK TO HEALTH and
DANGER OF BURNS
due to released vapors and easily
CAUTION!
flammable cleaning agents.
When using red lead putty, adhesives
and solvents ensure adequate
ventilation inside the installation room.
When using solvents, avoid open
flames, incandescence and sparks.
Please observe the manufacturer's
handling and safety instructions.
Clean the hub sealing faces with a rag soaked in
cleaning agent.
Evenly coat the boiler hub sealing faces with red lead
putty.
Coat the packing spring or packing groove with
adhesive (adhesive base).
16
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
2
1
Fig. 5
Remove burrs
1 Boiler hubs
2 Back section
3 Wood blocks
4 Sealing spring
1
Fig. 6
Coat boiler hubs with red lead putty
1 Boiler hub sealing face
2 Sealing spring
We reserve the right to make any changes due to technical modifications.
1
3
4
1
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents