Installation Of Water Connections; Installing B-Kit; Installation Of Boiler Drain (Included In B-Kit) - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

Boiler installation
8.2

Installation of water connections

8.2.1 Installing B-Kit:

The relief valve and the pressure/temperature gauge are
mounted on the conversion nipple (included in B-Kit) on
the VK boiler supply connection as follows:
Measure length of thread on R1¼" × 1¼" NPT
double nipple.
Seal supply manifold to connection VK with the long
side to the boiler.
Seal conversion nipple on boiler inlet VK.
Seal pressure/temperature gauge to conversion
nipple.
NOTICE
Do not install the pressure relief valve until
after the leak test (
page 36).
The pressure relief valve must be installed
in a vertical position.

8.2.2 Installation of boiler drain (included in B-Kit)

Install the boiler fill and drain valve with seal to
connector EL.
Seal boiler drain to connection EL.
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
Chapter 8.3,
1
RK
Fig. 46 Installing B-Kit
1 Supply manifold
2 Pressure/temperature gauge
Fig. 47 Installing B-Kit
1 90°-elbow 1¼" NPT
2 Pressure relief valve
3 Conversion nipple 1" x ¾"
EL
Fig. 48 Installation of boiler drain
8
2
VK
3
2
1
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents