Tips For The Boiler Room; Tools, Materials And Equipment; Disposal - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

Safety Considerations
DANGER TO LIFE
from electric shock.
Only qualified electricians are
WARNING!
permitted to carry out electrical work.
Before you open a device: Shut off
electrical supply and secure against
accidental activation.
Please observe all installation
instructions.

1.4.3 Tips for the boiler room

DANGER TO LIFE
through poisoning.
Insufficient ventilation can result in
WARNING!
hazardous discharge of flue gas when
operation requires air from the room.
Never block off or obstruct air ducts and
vents or reduce their size.
The boiler must not be operated until the
obstruction has been removed.
Inform the system user in writing of the
fault and associated danger.
RISK OF FIRE
through flammable materials or liquids.
Never store flammable materials or
WARNING!
liquids in the immediate vicinity of the
boiler.
DANGER TO LIFE
through toxic flue gases.
Make sure that mechanical ventilation
WARNING!
equipment, such as kitchen extraction
hoods, clothes dryers or fans, does not
extract combustion air from the boiler
room.
DANGER TO LIFE
through toxic flue gases.
Make sure that the boiler is only
WARNING!
operated with chimneys or exhaust
systems that allow the required
pressure during operation.
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
1.5

Tools, materials and equipment

Installation and maintenance of the boiler requires the
standard tools used in heating, oil, gas and water
installations.
The following may also prove useful:
– Sack trolley with strap or Buderus boiler trolley
– Wood supports
– Cleaning brushes and/or chemical cleaning agent for
wet cleaning
If the boiler is delivered in sections, you will also require
the following:
– Compression tool 1.2 if the boiler is supplied in
sections (
compression tool documentation)
– Flat board
– Cleaning agent
– Installation kit (accessory)
– Steel hammer and wooden or rubber mallet
– Half-round bastard file
– Screwdriver (Philips and slotted head)
– Flat chisel
– Wrench SW 19, 36, 13, 19, 18, 24, 27 and Allen key
SW19
– Support wedge, flat iron
– Cleaning rags and cloth
– Fine emery cloth
– Wire brush
– 3-in-1 oil
– Cleaning agent, ruler, chalk, straight edge
– Blanking flange with vent facility (for pressure test)
1.6

Disposal

Dispose of packaging in an environmentally
responsible manner.
Dispose of all heating system components that have
to be replaced at an authorized disposal site.
1
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents