Positioning And Levelling The Boiler - Buderus Logano G225 Installation And Service Instructions Manual

Fan-assisted low temperature/condensing boiler
Table of Contents

Advertisement

V Push the heat shield onto the insulating shells.
5.5

Positioning and levelling the boiler

V Move the boiler into its final location.
V Level the boiler by inserting the adjustable feet uo or
down as required and using a spirit level.
Protect boiler connections from damage and
dirt if the boiler is not to be installed
immediately.
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
Boiler block assembly
Fig. 51 Installation of the heat shield
Fig. 52 Levelling the boiler horizontally
5
6 720 615 876-51.1RS
7 747 019 141-11.1RS
37