Leveling The Boiler - Buderus Logano plus GB312 Installation Manual

Table of Contents

Advertisement

6
Installing the boiler
V Route all cables through the cable conduits to the pro-
gramming and connect them in accordance with the
wiring diagram.
Secure all cables with cable grips (supplied).
V Insert the cable grip together with the cable from the
top into the slots in the frame (step 1).
V Slide the cable grip downwards (step 2).
V Push against the grip (step 3).
V Flip the toggle up (step 4).
V Slot the programming unit cover into the guides and
slide downwards.
V Secure the programming unit cover with the two
screws.

6.12.2 Leveling the boiler

The boiler must be leveled so that the side panels and
front panel can be fitted.
V Loosen the nuts.
V Screw the adjustable feet in or out so as to level the
boiler with the aid of a spirit level.
V Retighten the nuts.
40
Fig. 34 Securing cables with cable grips
Fig. 35 Fitting the cover
Fig. 36 Leveling the boiler
1
2
3
Logano plus GB312 - Technical specifications are subject to change without prior notice
1 2
Screw
Nut
Spirit level
7 747 010 720-34.1RS
7 747 010 720-35.1RS
1 2
3
7 747 010 720-79.1RS

Advertisement

Table of Contents
loading

Table of Contents