Choosing A Site For Installation; Grounding The System - Cisco CiscoWorks Wireless LAN Solution Engine Installation And Configuration Manual

Table of Contents

Advertisement

Preparing Your Site for Installation

Choosing a Site for Installation

Warning

Grounding the System

Warning
Installation and Configuration Guide for the CiscoWorks Wireless LAN Solution Engine
2-8
Use the following precautions when planning the operating environment for your
WLSE.
Always follow the ESD-prevention procedures described in the
EMI" section on page 2-7
discharge can cause immediate or intermittent equipment failure.
Make sure that the chassis cover is secure. The chassis is designed to allow
cooling air to flow effectively within it. An open chassis allows air leaks,
which could interrupt and redirect the flow of cooling air from internal
components.
Electrical equipment generates heat. Ambient air temperature might not be
adequate to cool equipment to acceptable operating temperatures without
adequate circulation. Make sure that the room in which you operate has
adequate air circulation.
This unit is intended for installation in restricted access areas. A restricted
access area is where access can only be gained by service personnel through
the use of a special tool, lock and key, or other means of security, and is
controlled by the authority responsible for the location.
Choose a site with a dry, clean, well-ventilated and air-conditioned area.
Choose a site that maintains an ambient temperature of 10° to 35°C (50° to
95°F).
Never defeat the ground conductor or operate the equipment in the absence of
a suitably installed ground conductor. Contact the appropriate electrical
inspection authority or an electrician if you are uncertain that suitable
grounding is available.
Chapter 2
Preparing to Install WLSE 1130-19 Hardware
to avoid damage to equipment. Damage from static
"Preventing
78-16345-01

Advertisement

Table of Contents
loading

Table of Contents