Figure 4-6 Installation sequence of the pressure plate assembly
Figure 4-7 Completion of the installation of a single cabinet
Note
B. Cabinet top fixation
When two or more cabinets are combined, the inter-cabinet connection is needed (note that the cabinet side
panels do not need to be dismounted during the connection of the two combined cabinets). Figure 4-8 shows the
position of the inter-cabinet connecting board before the cabinets are combined. Release the inter-cabinet
connecting board of the cabinet on the right and install it in the way as shown in Figure 4-9. The effect upon
completion of installing the cabinet is shown in Figure 4-10.
3P@C Installation Manual
Page 4-6
Reproduction and communication in any form prohibited without the written permission of SAGEM SA
Feet
Pressure
plate
When multiple cabinets are to be combined, the following
installation steps shall be also taken.
Nut
Spring
washer
Flat washer
Insulation
sleeve
Insulation pad
Expansion bolt
Cement floor