The equipment installation space is illustrated in Figure 4-2.

Figure 4-2 Equipment installation space

4.1.1. Installation on the Cement Floor

4.1.1.
4.1.1.
4.1.1.
The 19-inch cabinet 2.2 m high is installed on the cement floor by using pressure plates to press on the feet.
Since the feet have the insulating function and the pressure plate assembly contains insulating parts, the whole
equipment is insulated from the earth before the grounding cable is connected and the insulating requirements
can be effectively satisfied. See Figure 4-3 for the installation flow.
3P@C Installation Manual
Page 4-2
Reproduction and communication in any form prohibited without the written permission of SAGEM SA
The cabinet of 3P@C 4450E weighs about 150 kg and so
two professional installers are needed to install it. The side
of the rack shall not be less than 0.1 m away from the wall
surface, and the back of the rack shall keep a space of more
than 0.8 m from the wall surface and other equipments
(including the operation console chairs/desks), so as to
facilitate heat dissipation and equipment maintenance. The
distance between the front face of one cabinet row and that
of its adjacent row should be no less than 0.8 m.
Inner wall or
other barriers
4-f60.0 (Feet
position mark)
Use M12 expansion bolt
4-f60.0 (Feet
position mark)
Use M12 expansion bolt