Figure 4-3 Flow Of Cabinet Installation On The Cement Floor - Sagem 4450E Hardware Installation Manual

Triple play access concentrator
Table of Contents

Advertisement

Figure 4-3 Flow of cabinet installation on the cement floor

Position the cabinet
1.1.1.37
1.1.1.37
1.1.1.37
1.1.1.37
A. Marking
Decide the positions to install the expansion bolts according to the reference size and the positions of the feet in
the construction plane design drawings. Determine the mounting hole positions of the 2.2m cabinet and locate
the mounting hole positions of the feet with a marking template. (Note that the marking template is made of rigid
paper boards, placed in the packing wooden box of the 2.2 m standard cabinet and delivered along with the
cabinet). To avoid errors, repeat the measurement against the installation hole location diagram after all the hole
positions have been marked and make sure their sizes are correct. Figure 4-4 shows the mounting hole layout of
a single cabinet and Figure 4-5 shows that of two cabinets.
3P@C Installation Manual
Page 4-3
Reproduction and communication in any form prohibited without the written permission of SAGEM SA
Installation on
the cement floor
Cabinet
positioning
Cabinet leveling
Cabinet fixation
Insulation test
Test passed?
End the
installation
SAGEM 3P@C

Advertisement

Table of Contents
loading

This manual is also suitable for:

3p@c 4450e

Table of Contents