Preparation
Certain hardware placement and connection requirements must
be met before installation. This chapter tells you how to meet
these requirements to ensure proper operation.
To verify that the requirements have been met, you must have
the following information about the system:
location of the control unit (CU), wiring fields, network
interface, and power for the system
type and number of central office (CO) facilities provided by
the local telephone company
hardware requirements for the CU, wiring fields, telephones,
data equipment, and optional equipment
location of the telephones, data equipment, and optional
equipment
types and placement of CU modules
jack assignments for lines, trunks, and stations
requirements for voice and data features
Preparation 2-1