AT&T MERLIN LEGEND Installation & Maintenance Manual page 197

Hide thumbs Also See for MERLIN LEGEND:
Table of Contents

Advertisement

Installation
Hardware
Each kit includes:
instructions and parts sheet
110AB1-100JP12 termination blocks with modular jacks
110A1 wire troughs
D-rings
D8W cords
Tools (see Figure 40)
D-impact tool
spudger
hand tools
Procedure
1.
Drill two diagonally opposite holes in a suitable backboard
(plywood is recommended) for each piece of hardware. Keep
a 1/16-inch space between each piece of hardware.
2.
Mount the wire troughs and the termination blocks. There is a
wire trough above each termination block.
If necessary, repeat steps 1 and 2 for a second column.
3.
4.
Mount the termination blocks and terminate the station cable.
If the station cable is bottom feed, start at the top and work
down. If the station cable is top feed, start at the bottom and
work up.
Mount a termination block to the wall with appropriate
a.
fasteners.
Strip the jacket off the 4-pair DIW station wires, exposing
b.
the conductors.
c.
Punch down the station wires to the termination block.
System Wiring 3-89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents