Preparing For T640 Router Installation; T640 Site Preparation Checklist; Table 25: Site Preparation Checklist - Juniper T640 Hardware Manual

Core router
Hide thumbs Also See for T640:
Table of Contents

Advertisement

CHAPTER 4

Preparing for T640 Router Installation

T640 Site Preparation Checklist

Table 25: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Power
Measure distance between external power
sources and router installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack
Verify that your rack meets the minimum
requirements for the installation of the router.
Plan rack location, including required space
clearances.
Copyright © 2010, Juniper Networks, Inc.
T640 Site Preparation Checklist on page 65
T640 Rack Requirements on page 66
T640 Clearance Requirements for Airflow and Hardware Maintenance on page 68
The checklist in Table 25 on page 65 summarizes the tasks you need to perform when
preparing a site for router installation.
For More Information
"T640 Environmental Specifications"
on page 343
"T640 DC Power Distribution" on
page 353
"T640 DC Power Cable
Specifications" on page 352
"T640 Chassis Grounding Cable and
Lug Specifications" on page 345
"T640 DC Power System
Requirements" on page 350
"T640 Rack Requirements" on
page 66
"T640 Clearance Requirements for
Airflow and Hardware Maintenance"
on page 68
Performed By
Date
65