Step 2: Install The Mounting Hardware; Install The Mounting Hardware - Juniper MX2010 Manual

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

• Pallet jack attachment (model number MX2000-PLLT-JCK-ADPTR)
• Front component shipping cover
• Rear component shipping cover
• Phillips (+) screwdrivers, numbers 1, 2, and 3
• 1/2-in. (12.7 mm) drive ratchet
• 1/4-in. (6.35 mm) torque-controlled driver or socket wrench to tighten the nuts on the router
transport kit
• 1-1/8-in. (28.57 mm) torque-controlled driver or socket wrench to tighten router transport kit winch
mechanism
• 9/16-in. or 14-mm open-end or socket wrench with extension to remove bracket bolts from the
shipping pallet
• Electrostatic discharge wrist strap
• Antistatic mat

Step 2: Install the Mounting Hardware

IN THIS SECTION

Install the Mounting Hardware | 9

Install the Mounting Hardware
A mounting shelf is required for installing the router in a four-post rack or cabinet. The shelf is not
required for installing the router in an open-frame rack.
1. Slide the large shelf between the rack rails, resting the bottom of the shelf on the rack supports. The
large shelf installs on the rear rack rails, extending toward the front of the rack, as specified in the
MX2010 Universal Routing Platform Hardware
Guide, for large shelf installation.
9

Advertisement

Table of Contents
loading

Table of Contents