2.
Using a four-person team, transport the router to the rack installation location and center it in front
of the mounting shelf.
NOTE: A minimum of 38 in. (96.5 cm) of clearance is required to roll the chassis sideways.
NOTE: A minimum of 42 in. (106.7 cm) of circular space is required to rotate the chassis.
NOTE: The router transport kit handles can be removed to accommodate aisle width.
3.
Install the winch mount bracket to the rear rack rails by using the six captive screws, and tighten
the screws (see
Figure 25 on page
42).
41