Siemens SICHARGE D Dispenser Operating Instructions Manual page 47

Table of Contents

Advertisement

4. Then attach the hoisting gear.
5. Loosen the screws between the dispenser and the load carrier.
6. Lift the dispenser vertically.
Positioning the dispenser and inserting the cables
Check the stud bolts in the foundation for the following points:
• Mounted properly
• That the threads of the stud bolts protrude about 50 mm from the foundation.
• Nuts, spring lock washers and spring washers are removed from the stud bolt
Risk of crushing or cuts
When mounting, look out for moving parts and protruding cables and bolts.
1. Lower the dispenser carefully on top of the base area.
2. Open the device door.
3. Carefully insert the cables into the dispenser. Grasp the cables through the open cabinet
door.
4. Position the slots of the feet over the stud bolts.
Do not damage the stud bolts while placing on the base area.
Figure 5-8  Positioning the dispenser on the foundation
5. Leave the dispenser secured at the crane until the dispenser is attached. This way you
prevent tipping or falling over of the dispenser.
Dispenser
Operating Instructions, 10/2023, A5E52758387-AB
WARNING
Installation and mounting
5.5 Installing the dispenser
47

Advertisement

Table of Contents
loading

Table of Contents