Download Print this page
Siemens SICHARGE D Product Information
Hide thumbs Also See for SICHARGE D:

Advertisement

Quick Links

Advertisement

loading

Summary of Contents for Siemens SICHARGE D

  • Page 2 Preventive Maintenance Checklist for SICHARGE D and Dispenser Introduction Preparation Preventive Maintenance Checklist for SICHARGE D Preventive Maintenance Checklist for Dispenser Preventive Maintenance Checklist for SICHARGE D and Dispenser Product Information 07/2023 A5E52386197-AB...
  • Page 3 Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
  • Page 4 Table of contents Introduction ............................4 Preparation ............................5 Preventive Maintenance Checklist for SICHARGE D ................7 Preventive Maintenance Checklist for Dispenser ................10 Preventive Maintenance Checklist for SICHARGE D and Dispenser Product Information, 07/2023, A5E52386197-AB...
  • Page 5: Introduction

    • 12 months after commissioning After the first year, carry out the tests every 12 months. Perform the checks at shorter intervals if necessitated by the ambient conditions of the SICHARGE D charging station (e.g. high dust exposure). Preventive Maintenance Checklist for SICHARGE D and Dispenser...
  • Page 6: Preparation

    Note Estimated time Keep in mind that the estimated time to complete all maintenance steps is approximately 2.5 hours for the SICHARGE D and 1.5 hours for the Dispenser. List of Tools • Allen set - 4 to 19 mm •...
  • Page 7 Preparation Required material for standard maintenance per SICHARGE D Part Number Functional Description Quantity 8EM5905-0AA00-0AA3 Filter Mat G4 380x480x20mm Bottom Side 8EM5905-0AA00-0AA4 Filter Mat G4 380x550x20mm Bottom Rear 8EM5905-0AA00-0AA5 Filter Mat G4 220x520x20mm Top Side 8EM5905-0AA00-0AA6 Filter Mat G4 200x640x20mm Top Rear...
  • Page 8: Preventive Maintenance Checklist For Sicharge D

    ☐ ☐ ☐ Check the internal fans and clean them if necessary. ☐ ☐ ☐ Check the insulation of the fan cables for visible damage. ☐ ☐ ☐ Preventive Maintenance Checklist for SICHARGE D and Dispenser Product Information, 07/2023, A5E52386197-AB...
  • Page 9 Install LOGO! updates if available and the customer has agreed in written form. For this purpose, a ☐ ☐ ☐ micro-SD card is needed. Close and lock the door. ☐ ☐ ☐ Preventive Maintenance Checklist for SICHARGE D and Dispenser Product Information, 07/2023, A5E52386197-AB...
  • Page 10 Responsible person (optional) Customer Please take into consideration that the document is only valid after signatures of technician or if included in the final document delivered to the customer. Preventive Maintenance Checklist for SICHARGE D and Dispenser Product Information, 07/2023, A5E52386197-AB...
  • Page 11: Preventive Maintenance Checklist For Dispenser

    ☐ ☐ ☐ (first white LED, then green LED). Open Door, Shutdown and Power-Free State Open the door and check if any error message appears on the HMI of the SICHARGE D and the ☐ ☐ ☐ LEDs are red.
  • Page 12 Power-On, Update and Close Door Close and lock the door. ☐ ☐ ☐ Turn on -QA2 in the SICHARGE D and power on the system. ☐ ☐ ☐ Wait until the charging station is ready (LEDs green). ☐...