Summary of Contents for Siemens SICHARGE D

  • Page 2 SICHARGE D - Testing according to DIN VDE 0100-600 Introduction General test notes Test sequence Device overview SICHARGE D - Testing according to Test report on testing of the stationary electrical DIN VDE 0100-600 system or unit Commissioning Manual 01/2024...
  • Page 3 Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
  • Page 4: Table Of Contents

    Introduction ............................4 General test notes ..........................5 Test sequence ............................7 Device overview ..........................11 Test report on testing of the stationary electrical system or unit ............19 SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 5: Introduction

    Introduction This document is a guideline and test recommendation for commissioning the SICHARGE D and is based on the requirements of DIN VDE 0100 600 . The applicable local guidelines must be followed in each case. The responsibility for proper compliance with and implementation of the guidelines lies with the authorized electrician.
  • Page 6: General Test Notes

    • Remove the back-up fuses and connector modules of the surge protection devices prior to the insulation measurement: – +F01-FC1 ① Version with basic surge protection device ② Version with extended surge protection device SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 7 • After every measurement, ground the copper rails involved in the measurement to +F05- QA9; +F05-QA10; +F04-QA17; +F04-QA18 to discharge any residual charge in the EMC filters. ① DC busbar system area left ② DC busbar system area right SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 8: Test Sequence

    Note Check whether the Makrolon cover is covering the main switch. Never connect any voltage without the protective cover in front of the copper rails. SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 9 ③ +F04-BC3 ④ +F04-BC4 4. De-energize the charging station via the upstream switching device. 5. Reconnect the connector of the Open Controller (+F03-KF1) in the de-energized state. SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 10 Version with basic surge protection device ② Version with extended surge protection device – +F10-FC5 – +F10-FB1 +F03-FC12 +F03-FC16 +F03-FC18 +F03-FC13 +F03-FC17 +F03-FC20 +F03-FC14 +F03-FB2 +F03-FC21 +F03-FC15 +F03-FB3 +F03-FC22 SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 11 12. Reset the residual current circuit breaker. Close the device door. Commissioning is complete. The charging station can be powered on for operation by customers via the upstream switching element. SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 12: Device Overview

    TB17 KF13 QA26 XD38 KF10 QA25 XD103 XD16 FC18 KF4 KF5 KF9 QA28...35 FC20 FC21 FC22 FC12...FC17 FC20 FC21 FC22 Figure 4-1 8EM Automation MM 2XCCS2 Full SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 13 KF13 QA26 XD38 KF10 QA25 XD103 XD16 FC18 KF4 KF5 KF9 QA28...35 FC20 FC21 FC22 FC12...FC17 FC20 FC21 FC22 Figure 4-2 8EM Automation MM 1xCHA 1xCCS2 Full SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 14 FA13 XD31 FC2 FC3 XD39 XD32 FC2 FC3 FA12 XD37 FC1.1 FC1.2 XD35 XD36 FC1.3 XD34 XD140 - XD150 Figure 4-3 Version with basic surge protection device SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 15 FA13 XD31 FC2 FC3 FA10 FA11 FA12 XD32 FC2 FC3 XD36 XD37 FC1.1 FC1.2 XD35 FC1.3 XD34 FA4 FA5 Figure 4-4 Version with extended surge protection device SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 16 QA20 QA19 QA21 QA24 QA17 QA16 QA18 QA15 Figure 4-5 DC busbar system area right QA13 QA10 QA14 QA12 QA11 Figure 4-6 DC busbar system area left SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 17 Device overview XD41 XD42 Figure 4-7 Insulation monitor and voltage transformer SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 18 Device overview XD23 PZ1/ PZ3/ PZ4 - PZ10 / PZ11 / PZ12 XD22 XD102 XD21 KF15 XD24 Figure 4-8 Overview of black panel SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 19 Device overview Figure 4-9 Components for AC charging Figure 4-10 Dispenser interface SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 20: Test Report On Testing Of The Stationary Electrical System Or Unit

    Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 21 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 22 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 23 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 24 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 25 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 26 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 27 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 28 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...
  • Page 29 Test report on testing of the stationary electrical system or unit SICHARGE D - Testing according to DIN VDE 0100-600 Commissioning Manual, 01/2024, A5E52910486-AC...