Siemens SICHARGE D Dispenser Operating Instructions Manual page 42

Table of Contents

Advertisement

Installation and mounting
5.3 Base area
Let the thread of the M12 stud bolts protrude approx. 50 mm from the foundation at the
fastening points
Figure 5-4  Top view of the base area
Use the hole drilling template 8EM5905-0AA00-2AA3 to ensure that the drill holes and
outlets of the connecting cables are positioned correctly.
You can find more information about installation here: SICHARGE D dispenser technical draw­
ings (https://support.industry.siemens.com/cs/ww/en/view/109822247)
Figure 5-5  Drilling template
Insert M12 stud bolts after drilling. Let the stud bolts protrude about 50 mm from the
foundation.
Figure 5-6  Example of a foundation with stud bolts and recesses for the various cables
Position the opening for the cables according to the given circumstances. Make the cutouts
large enough to make it easy to lay and connect the cables.
42
.
Cable entry
Example openings in the foundation walls for cable routing
Fastening points
Operating Instructions, 10/2023, A5E52758387-AB
Dispenser

Advertisement

Table of Contents
loading

Table of Contents