Programmable Safety Controller SCR P
Note: External terminal blocks are user-provided.
16. Go to the Functional View tab to try to add another Gate Switch.
Another Gate Switch can now be added because terminal optimization has been done manually.
17. Add a second Gate Switch and click OK to accept the default settings.
18. Go to the Wiring Diagram tab and notice the second Gate Switch has been added and no additional ETB has
been added.
180
Figure 129: Wiring Diagram tab with an E-stop button, optical sensor, gate switch, and ETBs
www.bernstein.eu
- Tel: + 49 571 793 0