Precor Precision 400 Series Service Manual page 105

Hide thumbs Also See for Precision 400 Series:
Table of Contents

Advertisement

Fuse verification and replacement
6. Skip this steps if you are not verifying the power entry module fuses.
a. Use a flat blade screwdriver to open the fuse compartment cover and remove
the two fuses.
b. Use an ohmmeter to verify the fuse continuity. The resistance should be short
circuit, close to zero ohms. Replace any fuse that measures significantly high
or an open circuit (infinite resistance). Only replace with 2.5 A slow blow rated
fuses.
Fuse spec: 2,5 A slow blow fuse
Installation
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
6 Available Replacement Procedures
Power Entry Module Replacement
Page 97

Advertisement

Table of Contents
loading

This manual is also suitable for:

Precision efx400-14Precision efx400-18

Table of Contents