Cleaning The Ion Tec; Replacing Charcoal Filter Pad; Having Periodical Electrical Safety Inspection Carried Out; Cleaning The Connection Cable And Mains Plug - B.Pro COOK I-FLEX 1 Translation Of The Original Operating Instructions

Table of Contents

Advertisement

COOK I-flex
OPERATING INSTRUCTIONS

Cleaning the ION TEC

Replacing charcoal filter
Having periodical
electrical safety
inspection carried out
Cleaning the connection
cable and mains plug
Checking the connection
cable and mains plug
86
)
The cleaning intervals for the ION TEC greatly depends on the unit's conditions of use.
B.PRO recommends replacing the ION TEC when odour filtering becomes less effective du-
ring normal operation. The filter change indicators on the B.PRO Control control electronics
can be used for guidance.
– Remove and clean ION TEC.
ª
Section "Filter change/cleaning interval"
ª
Section "Cleaning the odour filter box"
)
The change interval for the charcoal filter pad greatly depends on the unit's conditions of use.
pad
It is not possible to determine whether the charcoal filter pad is saturated on visual inspection.
B.PRO recommends replacing the charcoal filter pad when odour filtering becomes less effec-
tive during normal operation. The filter change indicators on the B.PRO Control control elect-
ronics can be used for guidance.
)
B.PRO recommends turning the charcoal filter pad around each time you clean the odour filter
box.
– Remove saturated charcoal filter pad.
ª
Section "Filter change/cleaning interval"
– Insert new charcoal filter pad.
ª
Section "Cleaning the odour filter box"
– Dispose of saturated charcoal filter pad.
ª
Chapter "Disposal"
– Have a qualified electrician perform a periodical electrical safety inspection as per the DIN
VDE 0702 series of standards at least once every six months.
– Check the connection cable and mains plug regularly for grease deposits. There is a danger
of electric shock if grease deposits form. Clean soiled connection cable and mains plug if
necessary.
– Disconnect the units from the power supply for cleaning.
– Check the connection cable and mains plug for mechanical damage and signs of excessive
deterioration at least once every six months in accordance with DGUV Regulation 3 (formerly
BGV A3) or equivalent national regulations.

Advertisement

Table of Contents
loading

Table of Contents