BayStream 7.3 Documentation Change Notice
A window displays the prompt:
Restart slot #<slot_no.>?
Click on OK to restart the processor located in that slot.
6.
Site Manager stores the new configuration in NVRAM and restarts the
processor. This store-and-restart process takes about 10 seconds to complete.
Repeat Steps 2 through 6 to reallocate memory partitioning on a different
7.
processor module, if applicable.
Repeat Steps 1 through 6 to reallocate memory partitioning on a processor
module in a different router.
When you finish, click on Done in the Kernel Configuration window.
8.
The main Site Manager window reappears.
Correction to Running Diagnostics
The first paragraph on page 3-23 of Troubleshooting and Testing incorrectly
recommends that you issue the
It also contains incorrect information about the DIAG LED on the front panel and
LED 8 on the FRE module. Refer to "Turning off the Indicator DIAG LED" on
page 3-24 for the correct instructions and information.
56
BayStream Multiservice Software Version 7.3
command after hot-swapping a link module.
diags
115385-D Rev 01