Liv Status Enquiry Procedures; Table 4. Status Enquiry And Response Messages - Bay Networks Baystream 7 Notice

Documentation change
Hide thumbs Also See for Baystream 7:
Table of Contents

Advertisement

BayStream 7.3 Documentation Change Notice
Table 4.
Message Type
Link Integrity Verification (LIV)
Status Enquiry
Link Integrity Verification (LIV) Status
Response
Full Status Enquiry
Full Status Response
During the initialization phase, one of two conditions can occur at the slave node:

LIV status enquiry procedures

Fast start procedures
LIV Status Enquiry Procedures
When the master node attempts to bring up the slave node using LIV status
enquiry messages on each link, the slave node simply responds to the messages
with LIV Status Response messages. This pattern will repeat until one of the links
receives a full status enquiry. At this point the slave node will respond with a full
status response and initiates bi-directional procedures on that link.
Note: The master node only sends a full status enquiry message on the
selected link. This point may be reached after responding to as few as one LIV
status enquiry message from the master node.
18
Status Enquiry and Response Messages
BayStream Multiservice Software Version 7.3
Description
Represents a Status Enquiry Message with a
Report Type of Link Integrity Verification Only
Represents a Status Message with a Report
Type of Link Integrity Verification Only
Represents a Status Enquiry Message with a
Report Type of Full Status
Represents a Status Message with a Report
Type of Full Status
115385-D Rev 01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Baystream 7.3

Table of Contents