file:///E:/PV-9661_PV-9662/SVC/s0502140200.html
5.2.14.2 Reassembly Notes
TOP PREVIOUS NEXT
1.
Alignment of Loading Rack Unit, T Loading Arm Unit, and S Loading Arm Unit
A. Slide the Loading Rack Unit so that the holes on it and the holes on the chassis line up
properly.
B. Install the S Loading Arm Unit onto the Chassis.
C. Install the T Loading Arm Unit so that the triangle-shaped indent is aligned with the
arrow on the S Loading Arm Unit as shown. Confirm that each hole on the T Loading
Arm Unit, Chassis, and Loading Rack Unit are through holes.
TOP PREVIOUS NEXT
file:///E:/PV-9661_PV-9662/SVC/s0502140200.html [2006-01-28 11:10:29]
Fig. J13-2